Rig 14

Rig 14

A Highly Mobile Drilling Rig Capable of Working Efficiently in Extreme Arctic Conditions

Rig 14

DDI Rig 14 is a fully integrated, single-module unit that measures 127 feet long by 56 feet wide, and is capable of drilling on twelve foot well spacing. The single module layout consists of three fully enclosed levels to provide maximum operational and heating efficiency. The ground level contains the mud pits, fuel and water tanks, pipe shelter, centrifugal pumps, rig hydraulics, and wheel assemblies. The second level consists of the steam boilers, moving hydraulics, support equipment, mud sack room, generators and solids control equipment. The third level comprises the rig floor, derrick and high line power transformer unit.

The rig is self-moving, utilizing a Columbia hydraulic wheel system capable of 2.5 mph over level roadways. For well-to-well moves, or level pad-to-pad moves, the mast remains standing, which decreases moving time. For longer pad-to-pad moves, the mast is lowered to a cradle on the substructure, and is moved with the module. The rig floor is a sliding cantilever, allowing for movement of the mast toward the center of the rig structure for wheel load balancing.

The mast hoisting capacity is 500,000 lbs. with a ten-line hook up, and the substructure is capable of a simultaneous load of 290,000 lbs. for pipe set back, and 400,000 lbs. rotary table load.


Hoisting / Rotary Equipment

  • Prime Movers: 3 ea. – Cat 3512 C
  • Available HP: 4,428 bhp / 3,303 kW
  • Mast capacity: 500,000 lb
  • Set Back Capacity (lb): 290,000 lb
  • Setback: 160, 5” DP @ 19.5 lbs/ft
  • Topdrive: NOV 11 SA capable of 37,500 ft/lbs continuous torque
  • Rotary Table: 1 ea.- Dreco w/ 27 1/2″ opening
  • Rotary Table Torque: 33,700 ft-lbs in low
  • Mud Pumps: 2 ea. -Continental Emsco FB-1600 triplexes
  • Pump Liner Sizes Available: 5 1/2″, 5 3/4″, 6″, 6 1/4″, 6 1/2″, 6 3/4″, 7″
  • Corresponding Working Pressure (psi): 5000, 5000, 4665, 4299, 3981, 3688, 3423
  • Drawworks: Dreco Model Superior 1250 UE, 500,000# hoisting capability

Mud System / Solids Control

  • Scalping Shakers: 2 each Derrick Hi-G, 3 Panel
  • Linear Motion Shakers: 2 Derrick model 2000, Hi-G, 4 Panel, W/AWD
  • Centrifuge: 1 each Derrick, DE-1000
  • Number of Pits: Eight with total volume – 998 bbl
  • Desilter: 2 – Tri Flo w/ 4″- 8 cone, dual manifold mud cleaners

Blowout Prevention Equipment

  • Diverter: Hydril 21 1/4″ 2000 psi , flanged
  • Annular Hydril: 13 5/8″ 5000 psi ,model GK
  • Rams: 1 – Hydril MPL, double, 13 5/8″ 5000 psi with 10″ operators
  • Shear Ram: 1 – Hydril MPL, single, 13 5/8″ 5000 psi with 14″ operator
  • Choke Manifold: 5000 psi system

Modules

  • Number of modules (excluding camp): 1
  • Number self- propelled: 1

General Rig Moving Information

  • Average move time well-well: 4.5 hrs well to well, 28.5 hours pad to pad , 12 miles avg
  • Maximum load: substructure- 2,570 kips

Dimension Capabilities

  • Minimum well spacing: 12′-6″
  • GL to floor: 33′-6″ w/mat
  • Maximum move height: pad to pad – 185′, well to well – 51′ (derrick down)